{"id":10949,"date":"2026-11-20T14:46:00","date_gmt":"2026-11-20T20:46:00","guid":{"rendered":"https:\/\/lrgrealty.com\/lrg-blog\/?p=10949"},"modified":"2026-11-13T15:47:51","modified_gmt":"2026-11-13T21:47:51","slug":"medical-office-leasing-texas-buildout-compliance","status":"publish","type":"post","link":"https:\/\/lrgrealty.com\/lrg-blog\/medical-office-leasing-texas-buildout-compliance\/","title":{"rendered":"Medical Office Leasing in Texas"},"content":{"rendered":"<div class=\"rl-page rl-lrg-v2 rl-commercial-suite cl-next-five cl-next-21\">\n<header class=\"cl-hero\">\n<div class=\"cl-inner\">\n<div class=\"cl-hero-grid\">\n<div class=\"cl-hero-copy\">\n<p class=\"cl-eyebrow\">COMMERCIAL LEASING \u00b7 SAN ANTONIO AND TEXAS \u00b7 PRACTICE GUIDE<\/p>\n<h1>Medical Office Leasing <span class=\"cl-accent\">in Texas<\/span><\/h1>\n<div class=\"rl-mh-slot\"><\/div>\n<p class=\"cl-intro\">A medical suite can look ready for patients and still lack the infrastructure, approvals or privacy layout the proposed services need. Before negotiating rent, a practice needs a clear service description, technical feasibility, a responsibility matrix and a realistic schedule.<\/p>\n<div class=\"cl-actions\">\n<a class=\"cl-btn cl-btn-red\" href=\"\/lrg-blog\/connect-with-lrg\/?intent=commercial\">Discuss a medical office lease with LRG<\/a><br \/>\n<a class=\"cl-btn cl-btn-outline\" href=\"#medical-funding-gap\">Model your funding gap<\/a><\/div>\n<\/div>\n<aside class=\"cl-hero-aside cl-expert-hero\" aria-label=\"LRG leasing takeaway\"><span class=\"cl-expert-eyebrow\">FROM THE LEASING DESK <span aria-hidden=\"true\">\/<\/span> LRG TAKE<\/span><\/p>\n<p class=\"cl-expert-statement\">A clinical floor plan is only valuable if the practice can legally and practically operate in it. Settle the services and approvals before the rent.<\/p>\n<div class=\"cl-expert-rule\"><span>THE PRACTICE TEST<\/span><strong>Define the services before you negotiate the space.<\/strong><\/div>\n<\/aside>\n<\/div>\n<\/div>\n<\/header>\n<nav class=\"cl-quick-path cl-inner\" aria-label=\"Start with your medical office question\">\n<a class=\"cl-quick-step\" href=\"#texas-licensing-is-facility-specific\"><span>CHECK THE LICENSE<\/span><strong>Does the facility need a state license?<\/strong><small>It depends on the services.<\/small><\/a><br \/>\n<a class=\"cl-quick-step\" href=\"#a-medical-finish-out-is-an-infrastructure-project\"><span>CHECK THE BUILD-OUT<\/span><strong>Can the building support the equipment?<\/strong><small>Power, plumbing and ventilation first.<\/small><\/a><br \/>\n<a class=\"cl-quick-step\" href=\"#negotiating-the-ti-allowance-and-the-full-project-budget\"><span>CHECK THE BUDGET<\/span><strong>What will the allowance not cover?<\/strong><small>Model the full project cost.<\/small><\/a><\/nav>\n<p><main class=\"cl-inner cl-main\"><\/p>\n<div class=\"cl-reading-layout\">\n<aside class=\"cl-toc-column\">\n<nav aria-label=\"On this page\" class=\"cl-jump cl-toc-desktop\"><strong>IN THIS GUIDE<\/strong><span class=\"cl-toc-descriptor\">Plan the practice first<\/span><a href=\"#start-with-the-services-not-the-medical-office-label\">Start with the services<\/a><a href=\"#texas-licensing-is-facility-specific\">Texas licensing<\/a><a href=\"#a-medical-finish-out-is-an-infrastructure-project\">Finish-out infrastructure<\/a><a href=\"#accessibility-and-certificates-of-occupancy-in-texas\">Accessibility and occupancy<\/a><a href=\"#designing-for-privacy-and-staff-workflow\">Privacy and workflow<\/a><a href=\"#negotiating-the-ti-allowance-and-the-full-project-budget\">TI and project budget<\/a><a href=\"#time-delivery-condition-and-lease-commencement\">Timing and commencement<\/a><a href=\"#a-medical-office-lease-review-packet\">Lease review packet<\/a><a href=\"#frequently-asked-questions\">FAQs<\/a><a href=\"#primary-sources\">Sources<\/a><\/nav>\n<div class=\"cl-toc-foot cl-toc-cta\"><span class=\"cl-toc-mark\" aria-hidden=\"true\"><\/span><\/p>\n<p>Looking at medical space? LRG can help line up the build-out and lease questions.<\/p>\n<p><a class=\"cl-btn cl-btn-red\" href=\"\/lrg-blog\/connect-with-lrg\/?intent=commercial\">Request a medical space review<\/a><\/div>\n<\/aside>\n<div class=\"cl-reading-content\">\n<details class=\"cl-toc-mobile\">\n<summary>In this guide <span>Jump to a section<\/span><\/summary>\n<nav aria-label=\"Mobile guide sections\"><a href=\"#start-with-the-services-not-the-medical-office-label\">Start with the services<\/a><a href=\"#texas-licensing-is-facility-specific\">Texas licensing<\/a><a href=\"#a-medical-finish-out-is-an-infrastructure-project\">Finish-out infrastructure<\/a><a href=\"#accessibility-and-certificates-of-occupancy-in-texas\">Accessibility and occupancy<\/a><a href=\"#designing-for-privacy-and-staff-workflow\">Privacy and workflow<\/a><a href=\"#negotiating-the-ti-allowance-and-the-full-project-budget\">TI and project budget<\/a><a href=\"#time-delivery-condition-and-lease-commencement\">Timing and commencement<\/a><a href=\"#a-medical-office-lease-review-packet\">Lease review packet<\/a><a href=\"#frequently-asked-questions\">Questions answered<\/a><a href=\"#primary-sources\">Sources<\/a><\/nav>\n<\/details>\n<section class=\"cl-section\" id=\"key-takeaways\">\n<div class=\"cl-heading\"><span class=\"cl-kicker\">THE SHORT VERSION \/ SIX TAKEAWAYS<\/span><\/p>\n<h2 id=\"six-takeaways-before-you-decide\">Six takeaways <span class=\"cl-accent\">before you decide<\/span><\/h2>\n<\/div>\n<div class=\"cl-grid cl-grid-3\">\n<div class=\"cl-panel\"><span class=\"cl-kicker\">Services<\/span><\/p>\n<p>The clinical services drive the floor plan, utilities and licensing questions.<\/p>\n<\/div>\n<div class=\"cl-panel\"><span class=\"cl-kicker\">Licensing<\/span><\/p>\n<p>Not every physician office falls under the same rules as a surgery center.<\/p>\n<\/div>\n<div class=\"cl-panel\"><span class=\"cl-kicker\">Accessibility<\/span><\/p>\n<p>Federal ADA standards and Texas accessibility review may affect the design.<\/p>\n<\/div>\n<div class=\"cl-panel\"><span class=\"cl-kicker\">Budget<\/span><\/p>\n<p>The landlord allowance and the full project cost are different numbers.<\/p>\n<\/div>\n<div class=\"cl-panel\"><span class=\"cl-kicker\">Privacy<\/span><\/p>\n<p>Privacy safeguards should inform the layout and equipment decisions.<\/p>\n<\/div>\n<div class=\"cl-panel\"><span class=\"cl-kicker\">Timing<\/span><\/p>\n<p>Delivery dates, change orders and restoration duties need clear lease terms.<\/p>\n<\/div>\n<\/div>\n<\/section>\n<section class=\"cl-section\" id=\"start-with-the-services-not-the-medical-office-label\">\n<div class=\"cl-heading\"><span class=\"cl-kicker\">PRACTICE PLANNING \/ QUICK ANSWER<\/span><\/p>\n<h2 id=\"start-with-the-services-not-the-medical-office-label\">Start with the services, <span class=\"cl-accent\">not the medical office label<\/span><\/h2>\n<\/div>\n<div class=\"cl-note\">\n<p><strong>Quick answer:<\/strong> &#8220;Medical office&#8221; covers very different uses. Write down the exact services, equipment and patient flow first. The licensing path and construction needs follow from that list, not from the sign on the building.<\/p>\n<\/div>\n<p>A general consultation practice may need modest exam and reception space. An infusion, imaging, dental, therapy or outpatient surgical operation may need specialized equipment, plumbing, power, ventilation and other infrastructure.<\/p>\n<div class=\"cl-grid cl-grid-4\">\n<div class=\"cl-panel\"><span class=\"cl-kicker\">Patients<\/span><\/p>\n<h3>Patient flow<\/h3>\n<p>Arrival, check-in, treatment, checkout and visitor paths.<\/p>\n<\/div>\n<div class=\"cl-panel\"><span class=\"cl-kicker\">Rooms<\/span><\/p>\n<h3>Treatment rooms<\/h3>\n<p>Exam, procedure and specialty rooms with their needs.<\/p>\n<\/div>\n<div class=\"cl-panel\"><span class=\"cl-kicker\">Equipment<\/span><\/p>\n<h3>Equipment list<\/h3>\n<p>Each device with its power, plumbing and weight needs.<\/p>\n<\/div>\n<div class=\"cl-panel\"><span class=\"cl-kicker\">Operations<\/span><\/p>\n<h3>Records and waste<\/h3>\n<p>Records storage, waste handling and special systems.<\/p>\n<\/div>\n<\/div>\n<div class=\"cl-example-compare\">\n<div class=\"cl-example-heading\"><span class=\"cl-kicker\">TWO DIFFERENT REVIEWS<\/span><\/p>\n<p>A broker and a medical planner answer different questions about the same suite.<\/p>\n<\/div>\n<div class=\"cl-example-pair\">\n<div><small>BROKER REVIEW<\/small><strong>Real estate fit<\/strong><span>Location, access, parking, condition and lease terms<\/span><\/div>\n<div class=\"cl-versus\" aria-hidden=\"true\">VS<\/div>\n<div><small>SPECIALIST REVIEW<\/small><strong>Clinical feasibility<\/strong><span>Licensing, systems, infection control and accessibility<\/span><\/div>\n<\/div>\n<p><strong>Use both.<\/strong> An architect or medical facilities planner turns the service list into a feasibility program.<\/p>\n<\/div>\n<\/section>\n<section class=\"cl-section\" id=\"texas-licensing-is-facility-specific\">\n<div class=\"cl-heading\"><span class=\"cl-kicker\">REGULATION \/ STATE LICENSING<\/span><\/p>\n<h2 id=\"texas-licensing-is-facility-specific\">Texas licensing is <span class=\"cl-accent\">facility-specific<\/span><\/h2>\n<\/div>\n<p>Texas Health and Human Services regulates certain types of health care facilities, and licensing requirements vary by facility type. A routine professional office should not be described as needing a surgery center license, and a proposed procedure facility should not be treated as an ordinary office without review.<\/p>\n<div class=\"cl-example-compare\">\n<div class=\"cl-example-heading\"><span class=\"cl-kicker\">OFFICE OR LICENSED FACILITY<\/span><\/p>\n<p>The exact services decide which category applies.<\/p>\n<\/div>\n<div class=\"cl-example-pair\">\n<div><small>PROFESSIONAL OFFICE<\/small><strong>Not automatically licensed<\/strong><span>Routine office practice is not an ambulatory surgical center<\/span><\/div>\n<div class=\"cl-versus\" aria-hidden=\"true\">VS<\/div>\n<div><small>AMBULATORY SURGICAL CENTER<\/small><strong>State license required<\/strong><span>HHSC says Health and Safety Code Chapter 243 sets ASC licensing<\/span><\/div>\n<\/div>\n<p><strong>Who decides?<\/strong> The regulator, based on the exact services. Ask before the lease is signed.<\/p>\n<\/div>\n<p>HHSC states that Texas Health and Safety Code Chapter 243 establishes the state licensing requirements for ambulatory surgical centers, with the rules now in Texas Administrative Code Title 26, Part 1, Chapter 508. Regulatory review can involve design, construction and inspection requirements.<\/p>\n<div class=\"cl-note\">\n<h3>Do not assume a category<\/h3>\n<p>A clinic, a physician practice, a surgery center and other specialized facilities do not necessarily follow the same state licensing rules. Get an answer based on your exact services, and settle who secures each approval before signing. <a href=\"https:\/\/www.hhs.texas.gov\/providers\/health-care-facilities-regulation\" rel=\"noopener noreferrer\" target=\"_blank\">See the HHSC facility categories<\/a>.<\/p>\n<\/div>\n<\/section>\n<section class=\"cl-section\" id=\"a-medical-finish-out-is-an-infrastructure-project\">\n<div class=\"cl-heading\"><span class=\"cl-kicker\">BUILD-OUT \/ INFRASTRUCTURE<\/span><\/p>\n<h2 id=\"a-medical-finish-out-is-an-infrastructure-project\">A medical finish-out is <span class=\"cl-accent\">an infrastructure project<\/span><\/h2>\n<\/div>\n<p>Exam rooms, procedure rooms, lab functions, imaging suites and treatment areas place different demands on a building. The team may need to study electrical capacity, plumbing fixtures, medical gases, wastewater, ventilation, structure and equipment delivery routes. Work hidden above ceilings or behind walls can dominate the construction plan.<\/p>\n<p class=\"cl-scroll-hint\">Swipe to view the full table. Keyboard users can focus and scroll the table.<\/p>\n<div class=\"cl-scroll\" role=\"region\" aria-label=\"Medical build-out scope map\" tabindex=\"0\">\n<table class=\"cl-table\">\n<caption class=\"cl-caption\">Build-out components, the technical question for each and the owner or tenant question to settle.<\/caption>\n<thead>\n<tr>\n<th scope=\"col\">Component<\/th>\n<th scope=\"col\">Technical question<\/th>\n<th scope=\"col\">Owner or tenant question<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td><strong>Patient and staff areas<\/strong><\/td>\n<td>Circulation, privacy and accessibility<\/td>\n<td>Who approves the design?<\/td>\n<\/tr>\n<tr>\n<td><strong>Power and equipment<\/strong><\/td>\n<td>Load, pathways and backup needs<\/td>\n<td>Who pays for upgrades?<\/td>\n<\/tr>\n<tr>\n<td><strong>Plumbing and ventilation<\/strong><\/td>\n<td>Capacity, routing and operation<\/td>\n<td>Who maintains and repairs?<\/td>\n<\/tr>\n<tr>\n<td><strong>Special clinical systems<\/strong><\/td>\n<td>Vendor requirements and safety<\/td>\n<td>Who removes them at lease end?<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<\/div>\n<div class=\"cl-note\">\n<h3>Building rules can matter more than the allowance<\/h3>\n<p>A landlord may allow alterations while limiting roof penetrations, noise, vibration or use of shared mechanical capacity. Get equipment schedules and vendor requirements before promising a move-in date.<\/p>\n<\/div>\n<\/section>\n<div class=\"cl-inline-cta\">\n<p>Evaluating a medical suite? LRG can help line up the space, the build-out questions and the lease terms.<\/p>\n<p><a class=\"cl-btn cl-btn-red\" href=\"\/lrg-blog\/connect-with-lrg\/?intent=commercial\">Ask LRG about a medical space<\/a><\/div>\n<section class=\"cl-section\" id=\"accessibility-and-certificates-of-occupancy-in-texas\">\n<div class=\"cl-heading\"><span class=\"cl-kicker\">APPROVALS \/ ACCESSIBILITY AND OCCUPANCY<\/span><\/p>\n<h2 id=\"accessibility-and-certificates-of-occupancy-in-texas\">Accessibility and certificates of occupancy <span class=\"cl-accent\">in Texas<\/span><\/h2>\n<\/div>\n<p>The U.S. Department of Justice publishes the 2010 ADA Standards for Accessible Design for covered new construction and alterations. Texas also runs an architectural barriers program through the Texas Department of Licensing and Regulation.<\/p>\n<div class=\"cl-example-compare\">\n<div class=\"cl-example-heading\"><span class=\"cl-kicker\">TDLR ACCESSIBILITY REVIEW<\/span><\/p>\n<p>TDLR&#8217;s FAQ sets a project cost threshold for submitting plans.<\/p>\n<\/div>\n<div class=\"cl-example-pair\">\n<div><small>UNDER &#36;50,000<\/small><strong>No plan submission required<\/strong><span>Projects below the threshold do not submit documents<\/span><\/div>\n<div class=\"cl-versus\" aria-hidden=\"true\">VS<\/div>\n<div><small>&#36;50,000 OR MORE<\/small><strong>Full documents submitted<\/strong><span>Projects at or above it submit a full set of construction documents<\/span><\/div>\n<\/div>\n<p><strong>Either way.<\/strong> Accessibility standards can still apply to a project below the submission threshold.<\/p>\n<\/div>\n<p>In San Antonio, each tenant space must obtain its own Certificate of Occupancy, and a change in occupancy or business use may require a new one. Inspections for a change of use typically cover building, electrical, mechanical, plumbing and fire, and a health inspection may also be required.<\/p>\n<p class=\"cl-scroll-hint\">Swipe to view the full table. Keyboard users can focus and scroll the table.<\/p>\n<div class=\"cl-scroll\" role=\"region\" aria-label=\"Approval checklist\" tabindex=\"0\">\n<table class=\"cl-table\">\n<caption class=\"cl-caption\">Each authority or professional, the question to ask and the evidence to keep.<\/caption>\n<thead>\n<tr>\n<th scope=\"col\">Authority or professional<\/th>\n<th scope=\"col\">Question<\/th>\n<th scope=\"col\">Evidence<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td><strong>Local development services<\/strong><\/td>\n<td>Is the use and construction approvable?<\/td>\n<td>Zoning and occupancy response<\/td>\n<\/tr>\n<tr>\n<td><strong>TDLR or accessibility specialist<\/strong><\/td>\n<td>What review and standards apply?<\/td>\n<td>Project documentation<\/td>\n<\/tr>\n<tr>\n<td><strong>HHSC, where applicable<\/strong><\/td>\n<td>Does the facility need a license?<\/td>\n<td>Facility-specific guidance<\/td>\n<\/tr>\n<tr>\n<td><strong>Clinical designers<\/strong><\/td>\n<td>Are systems and rooms supportable?<\/td>\n<td>Issued plans and scope<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<\/div>\n<p>The <a href=\"\/lrg-blog\/commercial-space-zoning-certificate-of-occupancy-texas\/\">zoning and occupancy guide<\/a> covers the San Antonio process in more detail.<\/p>\n<\/section>\n<section class=\"cl-section\" id=\"designing-for-privacy-and-staff-workflow\">\n<div class=\"cl-heading\"><span class=\"cl-kicker\">LAYOUT \/ PRIVACY<\/span><\/p>\n<h2 id=\"designing-for-privacy-and-staff-workflow\">Designing for privacy <span class=\"cl-accent\">and staff workflow<\/span><\/h2>\n<\/div>\n<p>A medical floor plan has to support patient care and confidential operations at the same time. Reception lines, conversations, records access, workstations and staff-only areas all affect privacy. HHS explains that the HIPAA Security Rule&#8217;s physical safeguards include facility access controls, workstation use, workstation security, and device and media controls.<\/p>\n<div class=\"cl-grid cl-grid-4\">\n<div class=\"cl-panel\">\n<h3>Patient flow<\/h3>\n<p>Map the path from entry through checkout.<\/p>\n<\/div>\n<div class=\"cl-panel\">\n<h3>Conversations<\/h3>\n<p>Locate confidential conversations and workstations.<\/p>\n<\/div>\n<div class=\"cl-panel\">\n<h3>Records and devices<\/h3>\n<p>Confirm secure equipment and records areas.<\/p>\n<\/div>\n<div class=\"cl-panel\">\n<h3>Vendor access<\/h3>\n<p>Check contractor and vendor access rules.<\/p>\n<\/div>\n<\/div>\n<div class=\"cl-note\">\n<h3>Layout supports compliance, it does not create it<\/h3>\n<p>A lease does not certify HIPAA compliance. The practice&#8217;s compliance team handles policies, technology and processes. Layout can still help or hurt, so ask early whether secure wiring, access control and records storage fit the building. <a href=\"https:\/\/www.hhs.gov\/hipaa\/for-professionals\/faq\/what-does-the-security-rule-mean-by-physical-safeguards\/index.html\" rel=\"noopener noreferrer\" target=\"_blank\">See the HHS explanation<\/a>.<\/p>\n<\/div>\n<\/section>\n<section class=\"cl-section\" id=\"negotiating-the-ti-allowance-and-the-full-project-budget\">\n<div class=\"cl-heading\"><span class=\"cl-kicker\">LEASE ECONOMICS \/ BUILD-OUT BUDGET<\/span><\/p>\n<h2 id=\"negotiating-the-ti-allowance-and-the-full-project-budget\">Negotiating the TI allowance <span class=\"cl-accent\">and the full project budget<\/span><\/h2>\n<\/div>\n<p>A tenant improvement allowance is a negotiated landlord contribution toward defined work, not a promise to fund the whole facility. Ask which items are eligible, when reimbursements are paid, who owns the improvements and whether unused funds expire.<\/p>\n<div class=\"cl-cost-stage\" aria-label=\"How the practice funding gap is found\">\n<div class=\"cl-cost-stage-top\"><span>THE FUNDING TEST<\/span><strong>The allowance is not the budget.<\/strong><\/div>\n<h3>What the practice may have to fund<\/h3>\n<p>Equipment, design fees and specialized systems may not be eligible for the allowance.<\/p>\n<div class=\"cl-cost-formula\" aria-label=\"Construction plus equipment plus design and permits, minus the TI allowance, equals the gap the practice funds\">\n<div><small>BUILD<\/small><b>Construction<\/b><\/div>\n<p><span class=\"cl-cost-plus\" aria-hidden=\"true\">+<\/span><\/p>\n<div><small>CLINICAL<\/small><b>Equipment<\/b><\/div>\n<p><span class=\"cl-cost-plus\" aria-hidden=\"true\">+<\/span><\/p>\n<div><small>SOFT COST<\/small><b>Design + permits<\/b><\/div>\n<p><span class=\"cl-cost-plus\" aria-hidden=\"true\">\u2212<\/span><\/p>\n<div><small>LANDLORD<\/small><b>TI allowance<\/b><\/div>\n<\/div>\n<div class=\"cl-cost-result\"><span>FUND<\/span><strong>The gap the practice covers<\/strong><small>Confirm which costs the allowance can pay.<\/small><\/div>\n<\/div>\n<div class=\"cl-next-tool\" id=\"medical-funding-gap\" data-cl-tool=\"medgap\">\n<div class=\"cl-next-toolhead\"><span>PRACTICE BUDGET WORKSHEET<\/span><\/p>\n<h3>Estimate the gap beyond the allowance<\/h3>\n<p>Enter your own estimates and the allowance offered in writing. No construction cost benchmarks are built in, and nothing leaves your browser.<\/p>\n<\/div>\n<div class=\"cl-next-fields\"><label>Construction estimate ($)<input data-field=\"construction\" inputmode=\"decimal\" min=\"0\" placeholder=\"Enter amount\" step=\"any\" type=\"number\"\/><\/label><label>Medical equipment estimate ($)<input data-field=\"equipment\" inputmode=\"decimal\" min=\"0\" placeholder=\"Enter amount\" step=\"any\" type=\"number\"\/><\/label><label>Design, permits and fees ($)<input data-field=\"soft\" inputmode=\"decimal\" min=\"0\" placeholder=\"Enter amount\" step=\"any\" type=\"number\"\/><\/label><label>Contingency (% of the total above)<input data-field=\"contingency\" inputmode=\"decimal\" min=\"0\" placeholder=\"Enter amount\" step=\"any\" type=\"number\"\/><\/label><label>TI allowance offered in writing ($)<input data-field=\"ti\" inputmode=\"decimal\" min=\"0\" placeholder=\"Enter amount\" step=\"any\" type=\"number\"\/><\/label><\/div>\n<div class=\"cl-next-results cl-next-results-3\">\n<div><small>PROJECT TOTAL<\/small><strong data-result=\"total\">Enter values<\/strong><\/div>\n<div><small>PRACTICE FUNDS<\/small><strong data-result=\"gap\">Enter values<\/strong><\/div>\n<div><small>ALLOWANCE SHARE<\/small><strong data-result=\"share\">Enter values<\/strong><\/div>\n<\/div>\n<div aria-live=\"polite\" class=\"cl-next-result\" data-result=\"interpretation\">Fill every field with your own estimates. Use 0 where a category does not apply.<\/div>\n<p class=\"cl-next-footnote\">Your estimates only. It cannot confirm that any cost is eligible for the allowance or that the allowance will be paid.<\/p>\n<\/div>\n<p>The lease should explain approvals, disbursement paperwork, lien protections, change orders and what happens if delays keep the practice from opening. The <a href=\"\/lrg-blog\/tenant-improvement-allowances-texas\/\">tenant improvement guide<\/a> covers allowances in more depth.<\/p>\n<\/section>\n<section class=\"cl-section\" id=\"time-delivery-condition-and-lease-commencement\">\n<div class=\"cl-heading\"><span class=\"cl-kicker\">SCHEDULE \/ COMMENCEMENT<\/span><\/p>\n<h2 id=\"time-delivery-condition-and-lease-commencement\">Time, delivery condition and <span class=\"cl-accent\">lease commencement<\/span><\/h2>\n<\/div>\n<p>A practice may need design approvals, equipment deliveries, contractor access and final inspections before it can see patients. A landlord may prefer rent to begin on a fixed date regardless of progress. Those goals conflict when a suite needs significant work.<\/p>\n<div class=\"cl-flow-strip\" aria-label=\"Three phases before the first patient\">\n<div><small>PHASE 1<\/small><strong>Feasibility<\/strong><span>Use, design and licensing review<\/span><\/div>\n<p><b aria-hidden=\"true\">\u2192<\/b><\/p>\n<div><small>PHASE 2<\/small><strong>Construction<\/strong><span>Scopes, approvals and work<\/span><\/div>\n<p><b aria-hidden=\"true\">\u2192<\/b><\/p>\n<div><small>PHASE 3<\/small><strong>Opening<\/strong><span>Inspections and approved occupancy<\/span><\/div>\n<\/div>\n<div class=\"cl-grid cl-grid-4\">\n<div class=\"cl-panel\">\n<h3>Delivery condition<\/h3>\n<p>What state the suite must be in at handover.<\/p>\n<\/div>\n<div class=\"cl-panel\">\n<h3>Base building repairs<\/h3>\n<p>Who fixes problems found during design.<\/p>\n<\/div>\n<div class=\"cl-panel\">\n<h3>Delay remedies<\/h3>\n<p>Whether commencement moves if approvals run late.<\/p>\n<\/div>\n<div class=\"cl-panel\">\n<h3>Restoration<\/h3>\n<p>What must be removed when the lease ends.<\/p>\n<\/div>\n<\/div>\n<div class=\"cl-note\">\n<h3>Free rent is not a delay remedy<\/h3>\n<p>Free rent does not automatically protect the practice if permitting runs long. The full lease and construction exhibits govern, and the <a href=\"\/lrg-blog\/letter-of-intent-commercial-lease-texas\/\">LOI guide<\/a> covers what to settle first.<\/p>\n<\/div>\n<\/section>\n<section class=\"cl-section\" id=\"a-medical-office-lease-review-packet\">\n<div class=\"cl-heading\"><span class=\"cl-kicker\">BROKER BRIEF \/ WHAT TO BRING<\/span><\/p>\n<h2 id=\"a-medical-office-lease-review-packet\">A medical office <span class=\"cl-accent\">lease review packet<\/span><\/h2>\n<\/div>\n<p>Bring the service list, equipment schedule, concept layout, technical requirements, available site records, the landlord&#8217;s work proposal and the full budget. Separate verified requirements from open questions, and give each professional time to answer before committing to an opening date.<\/p>\n<div class=\"cl-grid cl-grid-3\">\n<div class=\"cl-panel\"><span class=\"cl-kicker\">Services<\/span><\/p>\n<h3>Define the facility<\/h3>\n<p>Services and the facility classification that applies.<\/p>\n<\/div>\n<div class=\"cl-panel\"><span class=\"cl-kicker\">Fit<\/span><\/p>\n<h3>Get a test fit<\/h3>\n<p>A test fit and an equipment requirement sheet.<\/p>\n<\/div>\n<div class=\"cl-panel\"><span class=\"cl-kicker\">Approvals<\/span><\/p>\n<h3>Check every approval<\/h3>\n<p>City, TDLR and state approvals investigated.<\/p>\n<\/div>\n<div class=\"cl-panel\"><span class=\"cl-kicker\">Scope<\/span><\/p>\n<h3>Split the work<\/h3>\n<p>Landlord work separated from tenant work in the LOI.<\/p>\n<\/div>\n<div class=\"cl-panel\"><span class=\"cl-kicker\">Budget<\/span><\/p>\n<h3>Budget everything<\/h3>\n<p>The entire project, not just the allowance.<\/p>\n<\/div>\n<div class=\"cl-panel\"><span class=\"cl-kicker\">Terms<\/span><\/p>\n<h3>Confirm the terms<\/h3>\n<p>Timing, access and restoration in writing.<\/p>\n<\/div>\n<\/div>\n<div class=\"cl-note\">\n<h3>Where LRG fits<\/h3>\n<p>LRG can help practices compare properties and negotiate real estate terms in San Antonio and Central Texas. Licensing counsel, compliance advisors, architects, engineers and local authorities handle the specialized questions. See <a href=\"\/lrg-blog\/who-pays-commercial-real-estate-broker-texas\/\">how commercial broker compensation works<\/a>.<\/p>\n<\/div>\n<\/section>\n<section class=\"cl-section\" id=\"frequently-asked-questions\">\n<div class=\"cl-heading\"><span class=\"cl-kicker\">FAQ \/ COMMON PRACTICE QUESTIONS<\/span><\/p>\n<h2 id=\"common-questions-about-medical-office-leasing\">Common questions about <span class=\"cl-accent\">medical office leasing<\/span><\/h2>\n<\/div>\n<div class=\"cl-faqs\">\n<details>\n<summary>Does every Texas medical office need a facility license?<\/summary>\n<p>No. Licensing depends on the exact services and the facility category. Ask the relevant Texas regulator about the proposed operation.<\/p>\n<\/details>\n<details>\n<summary>What is the difference between a physician office and an ASC?<\/summary>\n<p>An ambulatory surgical center is a separately defined and licensed facility category under Texas law. Routine office practice is not the same thing.<\/p>\n<\/details>\n<details>\n<summary>Who pays for medical office construction?<\/summary>\n<p>The lease and work letter allocate costs. An allowance may cover some defined improvements, but not necessarily the whole project.<\/p>\n<\/details>\n<details>\n<summary>Can I use a space that had a different kind of medical tenant?<\/summary>\n<p>Not automatically. Different services, equipment or occupancy can trigger new review and construction.<\/p>\n<\/details>\n<details>\n<summary>Does a TI allowance cover medical equipment?<\/summary>\n<p>Only if the lease says so. Equipment eligibility, ownership and removal rights should be written out.<\/p>\n<\/details>\n<details>\n<summary>Is ADA compliance the same as a TDLR filing?<\/summary>\n<p>No. Meeting accessibility standards and completing Texas review procedures are related but separate obligations.<\/p>\n<\/details>\n<details>\n<summary>What does the &#36;50,000 TDLR threshold mean?<\/summary>\n<p>TDLR says projects costing &#36;50,000 or more must submit a full set of construction documents. Smaller projects can still have to meet accessibility standards.<\/p>\n<\/details>\n<details>\n<summary>Does a leased clinic need HIPAA safeguards?<\/summary>\n<p>Covered entities must meet HIPAA requirements for their systems. HHS describes the physical safeguard standards, and exact compliance depends on the operation.<\/p>\n<\/details>\n<details>\n<summary>Can a broker verify medical systems and licenses?<\/summary>\n<p>No. A broker can coordinate site information, but qualified specialists and regulators decide clinical, engineering and licensing questions.<\/p>\n<\/details>\n<details>\n<summary>What should a practice have before signing an LOI?<\/summary>\n<p>A service description, a preliminary space program, equipment and infrastructure needs, the likely approval path, a budget and an open issues list.<\/p>\n<\/details>\n<\/div>\n<\/section>\n<div class=\"cl-related\">\n<div class=\"cl-related-head\">\n<h2 id=\"keep-reading\">Keep reading<\/h2>\n<p><a href=\"\/lrg-blog\/commercial\/\">All commercial guides<\/a><\/div>\n<div class=\"cl-related-grid\"><a href=\"\/lrg-blog\/tenant-improvement-allowances-texas\/\"><span>Tenant improvement allowances<\/span><strong>Who pays, who builds, who owns<\/strong><i aria-hidden=\"true\">\u2192<\/i><\/a><a href=\"\/lrg-blog\/commercial-space-zoning-certificate-of-occupancy-texas\/\"><span>Is the space legal for the business?<\/span><strong>Zoning, occupancy and permits<\/strong><i aria-hidden=\"true\">\u2192<\/i><\/a><a href=\"\/lrg-blog\/letter-of-intent-commercial-lease-texas\/\"><span>Commercial letter of intent<\/span><strong>What to settle before the lease<\/strong><i aria-hidden=\"true\">\u2192<\/i><\/a><a href=\"\/lrg-blog\/how-much-office-space-does-your-business-need\/\"><span>How much office space?<\/span><strong>Size it from how you work<\/strong><i aria-hidden=\"true\">\u2192<\/i><\/a><\/div>\n<\/div>\n<section class=\"cl-section cl-bottom-cta\" id=\"commercial-leasing-help\">\n<div class=\"cl-heading\"><span class=\"cl-kicker\">LRG REALTY \/ SAN ANTONIO AND TEXAS<\/span><\/p>\n<h2 id=\"lease-a-suite-your-practice-can-open-in\">Lease a suite your practice can open in.<\/h2>\n<\/div>\n<p>LRG Realty helps medical practices compare properties, organize the specialist questions and negotiate build-out and timing terms.<\/p>\n<div class=\"cl-actions\">\n<a class=\"cl-btn cl-btn-red\" href=\"\/lrg-blog\/connect-with-lrg\/?intent=commercial\">Connect with LRG Realty<\/a><br \/>\n<a class=\"cl-btn cl-btn-outline\" href=\"\/lrg-blog\/commercial\/\">Browse commercial guides<\/a><\/div>\n<p class=\"cl-legal\">Educational material only, not legal, health care compliance, licensing, architectural or engineering advice. Requirements depend on the services, the building and current rules. Consult qualified professionals and the relevant authorities.<\/p>\n<\/section>\n<section class=\"cl-section\" id=\"primary-sources\">\n<div class=\"cl-heading\"><span class=\"cl-kicker\">RESEARCH \/ PRIMARY SOURCES<\/span><\/p>\n<h2 id=\"sources\">Sources<\/h2>\n<\/div>\n<p>Checked for this 2026 edition. These establish the licensing, accessibility, privacy and local permit framework; no construction cost, allowance amount or license outcome has been inferred. Regulators and the signed lease for an individual property control.<\/p>\n<div class=\"cl-sources\">\n<ul>\n<li><strong>Texas Health and Human Services.<\/strong> Health Care Facilities Regulation. <a href=\"https:\/\/www.hhs.texas.gov\/providers\/health-care-facilities-regulation\" rel=\"noopener noreferrer\" target=\"_blank\">https:\/\/www.hhs.texas.gov\/providers\/health-care-facilities-regulation<\/a><\/li>\n<li><strong>Texas Health and Human Services.<\/strong> Ambulatory Surgical Centers. <a href=\"https:\/\/www.hhs.texas.gov\/providers\/health-care-facilities-regulation\/ambulatory-surgical-centers\" rel=\"noopener noreferrer\" target=\"_blank\">https:\/\/www.hhs.texas.gov\/providers\/health-care-facilities-regulation\/ambulatory-surgical-centers<\/a><\/li>\n<li><strong>U.S. Department of Justice.<\/strong> 2010 ADA Standards for Accessible Design. <a href=\"https:\/\/www.ada.gov\/law-and-regs\/design-standards\/2010-stds\/\" rel=\"noopener noreferrer\" target=\"_blank\">https:\/\/www.ada.gov\/law-and-regs\/design-standards\/2010-stds\/<\/a><\/li>\n<li><strong>Texas Department of Licensing and Regulation.<\/strong> Architectural Barriers Frequently Asked Questions. <a href=\"https:\/\/www.tdlr.texas.gov\/ab\/abfaq.htm\" rel=\"noopener noreferrer\" target=\"_blank\">https:\/\/www.tdlr.texas.gov\/ab\/abfaq.htm<\/a><\/li>\n<li><strong>U.S. Department of Health and Human Services.<\/strong> What does the Security Rule mean by physical safeguards?. <a href=\"https:\/\/www.hhs.gov\/hipaa\/for-professionals\/faq\/what-does-the-security-rule-mean-by-physical-safeguards\/index.html\" rel=\"noopener noreferrer\" target=\"_blank\">https:\/\/www.hhs.gov\/hipaa\/for-professionals\/faq\/what-does-the-security-rule-mean-by-physical-safeguards\/index.html<\/a><\/li>\n<li><strong>City of San Antonio.<\/strong> Certificate of Occupancy. <a href=\"https:\/\/www.sa.gov\/Directory\/Departments\/DSD\/Constructing\/Business-Commercial\/Certificate-of-Occupancy\" rel=\"noopener noreferrer\" target=\"_blank\">https:\/\/www.sa.gov\/Directory\/Departments\/DSD\/Constructing\/Business-Commercial\/Certificate-of-Occupancy<\/a><\/li>\n<\/ul>\n<\/div>\n<\/section>\n<\/div>\n<\/div>\n<p><\/main><\/div>\n","protected":false},"excerpt":{"rendered":"<p>COMMERCIAL LEASING \u00b7 SAN ANTONIO AND TEXAS \u00b7 PRACTICE GUIDE Medical Office Leasing in Texas A medical suite can look ready for patients and still lack the infrastructure, approvals or privacy layout the proposed services need. Before negotiating rent, a practice needs a clear service description, technical feasibility, a responsibility matrix and a realistic schedule. [&hellip;]<\/p>\n","protected":false},"author":348,"featured_media":10954,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[20],"tags":[],"class_list":["post-10949","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-home-buying"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.8 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Medical Office Leasing in Texas | LRG Realty<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/lrgrealty.com\/lrg-blog\/medical-office-leasing-texas-buildout-compliance\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Medical Office Leasing in Texas | LRG Realty\" \/>\n<meta property=\"og:description\" content=\"COMMERCIAL LEASING \u00b7 SAN ANTONIO AND TEXAS \u00b7 PRACTICE GUIDE Medical Office Leasing in Texas A medical suite can look ready for patients and still lack the infrastructure, approvals or privacy layout the proposed services need. Before negotiating rent, a practice needs a clear service description, technical feasibility, a responsibility matrix and a realistic schedule. [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/lrgrealty.com\/lrg-blog\/medical-office-leasing-texas-buildout-compliance\/\" \/>\n<meta property=\"og:site_name\" content=\"LRG Realty Blog\" \/>\n<meta property=\"article:published_time\" content=\"2026-11-20T20:46:00+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/lrgrealty.com\/wp-content\/uploads\/2026\/11\/commercial-10949.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1536\" \/>\n\t<meta property=\"og:image:height\" content=\"1024\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"11 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/lrgrealty.com\\\/lrg-blog\\\/medical-office-leasing-texas-buildout-compliance\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/lrgrealty.com\\\/lrg-blog\\\/medical-office-leasing-texas-buildout-compliance\\\/\"},\"author\":{\"name\":\"\",\"@id\":\"\"},\"headline\":\"Medical Office Leasing in Texas\",\"datePublished\":\"2026-11-20T20:46:00+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/lrgrealty.com\\\/lrg-blog\\\/medical-office-leasing-texas-buildout-compliance\\\/\"},\"wordCount\":2360,\"image\":{\"@id\":\"https:\\\/\\\/lrgrealty.com\\\/lrg-blog\\\/medical-office-leasing-texas-buildout-compliance\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/lrgrealty.com\\\/wp-content\\\/uploads\\\/2026\\\/11\\\/commercial-10949.jpg\",\"articleSection\":[\"Home Buying\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/lrgrealty.com\\\/lrg-blog\\\/medical-office-leasing-texas-buildout-compliance\\\/\",\"url\":\"https:\\\/\\\/lrgrealty.com\\\/lrg-blog\\\/medical-office-leasing-texas-buildout-compliance\\\/\",\"name\":\"Medical Office Leasing in Texas | LRG Realty\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/lrgrealty.com\\\/lrg-blog\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/lrgrealty.com\\\/lrg-blog\\\/medical-office-leasing-texas-buildout-compliance\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/lrgrealty.com\\\/lrg-blog\\\/medical-office-leasing-texas-buildout-compliance\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/lrgrealty.com\\\/wp-content\\\/uploads\\\/2026\\\/11\\\/commercial-10949.jpg\",\"datePublished\":\"2026-11-20T20:46:00+00:00\",\"author\":{\"@id\":\"\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/lrgrealty.com\\\/lrg-blog\\\/medical-office-leasing-texas-buildout-compliance\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/lrgrealty.com\\\/lrg-blog\\\/medical-office-leasing-texas-buildout-compliance\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/lrgrealty.com\\\/lrg-blog\\\/medical-office-leasing-texas-buildout-compliance\\\/#primaryimage\",\"url\":\"https:\\\/\\\/lrgrealty.com\\\/wp-content\\\/uploads\\\/2026\\\/11\\\/commercial-10949.jpg\",\"contentUrl\":\"https:\\\/\\\/lrgrealty.com\\\/wp-content\\\/uploads\\\/2026\\\/11\\\/commercial-10949.jpg\",\"width\":1536,\"height\":1024,\"caption\":\"Medical Office Leasing in Texas\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/lrgrealty.com\\\/lrg-blog\\\/medical-office-leasing-texas-buildout-compliance\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/lrgrealty.com\\\/lrg-blog\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Medical Office Leasing in Texas\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/lrgrealty.com\\\/lrg-blog\\\/#website\",\"url\":\"https:\\\/\\\/lrgrealty.com\\\/lrg-blog\\\/\",\"name\":\"LRG Realty Blog\",\"description\":\"LRG Realty Blog\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/lrgrealty.com\\\/lrg-blog\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"\",\"url\":\"https:\\\/\\\/lrgrealty.com\\\/lrg-blog\\\/author\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Medical Office Leasing in Texas | LRG Realty","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/lrgrealty.com\/lrg-blog\/medical-office-leasing-texas-buildout-compliance\/","og_locale":"en_US","og_type":"article","og_title":"Medical Office Leasing in Texas | LRG Realty","og_description":"COMMERCIAL LEASING \u00b7 SAN ANTONIO AND TEXAS \u00b7 PRACTICE GUIDE Medical Office Leasing in Texas A medical suite can look ready for patients and still lack the infrastructure, approvals or privacy layout the proposed services need. Before negotiating rent, a practice needs a clear service description, technical feasibility, a responsibility matrix and a realistic schedule. [&hellip;]","og_url":"https:\/\/lrgrealty.com\/lrg-blog\/medical-office-leasing-texas-buildout-compliance\/","og_site_name":"LRG Realty Blog","article_published_time":"2026-11-20T20:46:00+00:00","og_image":[{"width":1536,"height":1024,"url":"https:\/\/lrgrealty.com\/wp-content\/uploads\/2026\/11\/commercial-10949.jpg","type":"image\/jpeg"}],"twitter_card":"summary_large_image","twitter_misc":{"Written by":"","Est. reading time":"11 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/lrgrealty.com\/lrg-blog\/medical-office-leasing-texas-buildout-compliance\/#article","isPartOf":{"@id":"https:\/\/lrgrealty.com\/lrg-blog\/medical-office-leasing-texas-buildout-compliance\/"},"author":{"name":"","@id":""},"headline":"Medical Office Leasing in Texas","datePublished":"2026-11-20T20:46:00+00:00","mainEntityOfPage":{"@id":"https:\/\/lrgrealty.com\/lrg-blog\/medical-office-leasing-texas-buildout-compliance\/"},"wordCount":2360,"image":{"@id":"https:\/\/lrgrealty.com\/lrg-blog\/medical-office-leasing-texas-buildout-compliance\/#primaryimage"},"thumbnailUrl":"https:\/\/lrgrealty.com\/wp-content\/uploads\/2026\/11\/commercial-10949.jpg","articleSection":["Home Buying"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/lrgrealty.com\/lrg-blog\/medical-office-leasing-texas-buildout-compliance\/","url":"https:\/\/lrgrealty.com\/lrg-blog\/medical-office-leasing-texas-buildout-compliance\/","name":"Medical Office Leasing in Texas | LRG Realty","isPartOf":{"@id":"https:\/\/lrgrealty.com\/lrg-blog\/#website"},"primaryImageOfPage":{"@id":"https:\/\/lrgrealty.com\/lrg-blog\/medical-office-leasing-texas-buildout-compliance\/#primaryimage"},"image":{"@id":"https:\/\/lrgrealty.com\/lrg-blog\/medical-office-leasing-texas-buildout-compliance\/#primaryimage"},"thumbnailUrl":"https:\/\/lrgrealty.com\/wp-content\/uploads\/2026\/11\/commercial-10949.jpg","datePublished":"2026-11-20T20:46:00+00:00","author":{"@id":""},"breadcrumb":{"@id":"https:\/\/lrgrealty.com\/lrg-blog\/medical-office-leasing-texas-buildout-compliance\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/lrgrealty.com\/lrg-blog\/medical-office-leasing-texas-buildout-compliance\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/lrgrealty.com\/lrg-blog\/medical-office-leasing-texas-buildout-compliance\/#primaryimage","url":"https:\/\/lrgrealty.com\/wp-content\/uploads\/2026\/11\/commercial-10949.jpg","contentUrl":"https:\/\/lrgrealty.com\/wp-content\/uploads\/2026\/11\/commercial-10949.jpg","width":1536,"height":1024,"caption":"Medical Office Leasing in Texas"},{"@type":"BreadcrumbList","@id":"https:\/\/lrgrealty.com\/lrg-blog\/medical-office-leasing-texas-buildout-compliance\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/lrgrealty.com\/lrg-blog\/"},{"@type":"ListItem","position":2,"name":"Medical Office Leasing in Texas"}]},{"@type":"WebSite","@id":"https:\/\/lrgrealty.com\/lrg-blog\/#website","url":"https:\/\/lrgrealty.com\/lrg-blog\/","name":"LRG Realty Blog","description":"LRG Realty Blog","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/lrgrealty.com\/lrg-blog\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"","url":"https:\/\/lrgrealty.com\/lrg-blog\/author\/"}]}},"_links":{"self":[{"href":"https:\/\/lrgrealty.com\/lrg-blog\/wp-json\/wp\/v2\/posts\/10949","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/lrgrealty.com\/lrg-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/lrgrealty.com\/lrg-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/lrgrealty.com\/lrg-blog\/wp-json\/wp\/v2\/users\/348"}],"replies":[{"embeddable":true,"href":"https:\/\/lrgrealty.com\/lrg-blog\/wp-json\/wp\/v2\/comments?post=10949"}],"version-history":[{"count":2,"href":"https:\/\/lrgrealty.com\/lrg-blog\/wp-json\/wp\/v2\/posts\/10949\/revisions"}],"predecessor-version":[{"id":10976,"href":"https:\/\/lrgrealty.com\/lrg-blog\/wp-json\/wp\/v2\/posts\/10949\/revisions\/10976"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/lrgrealty.com\/lrg-blog\/wp-json\/wp\/v2\/media\/10954"}],"wp:attachment":[{"href":"https:\/\/lrgrealty.com\/lrg-blog\/wp-json\/wp\/v2\/media?parent=10949"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/lrgrealty.com\/lrg-blog\/wp-json\/wp\/v2\/categories?post=10949"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/lrgrealty.com\/lrg-blog\/wp-json\/wp\/v2\/tags?post=10949"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}